This week I installed the windshield, the wiper assembly, gauges, a/c-heat unit and most of the wiring. It takes a lot of planning and time to run all the wiring in a car like this. I spent approximately 32 hrs. on the wiring this week.

Im003063.jpg (110795 bytes) Im003054.jpg (145156 bytes)  Im003057.jpg (100612 bytes) 

Im003060.jpg (165658 bytes) Im003061.jpg (149814 bytes) Im003056.jpg (141160 bytes)